APPROVED 28 LOT FINAL MAP. 95% SHOVEL READY. FULLY ENTITLED. SUBDIVISION, LIEN, & COA AGREEMENT WITH CITY. APPROVED ENGINEERED PLANS. GO TO: https://calprop.com/real-estate for all maps, subdivision agreement, COA, and other other downloadable documents. Owner recommends not building on Lot 5 given feasibility of retaining wall cost (significant savings). Project Notes, Tract 29476 in the City of Wildomar Project Name: Alta Colina, LLC Permits/Reports: California Water Boards, Stormwater WDID/App ID: 9-33C371295 45043, ACTIVE NPDES, WQMP, Army Corp, 401, 404, and MSHCP permits are ACTIVE. A burrowing owl study which is only valid for 30 days has to be re-submitted to City before grading. This process is inexpensive and the City will process immediately. 11 acres to be owned/managed by the RCA (Lots 29 and 30 are the RCA lots in the plans). A soils report has already been submitted and approved. Significant DG material, a huge plus. All entitlements and biologicals are completed (except burrowing owl). Plans: Owner/Builder strongly recommend that the buyer retains Osment Grading. Recent grading bid available as of March 2021. Grading can begin immediately after a final retaining wall plan is submitted and the grading bond is posted (grading permit is paid), but another builder may want to submit their own wall design. The Verdura retaining wall system in builder estimate will be the most cost effective solution (reviewed 3 systems). This will require a structural engineer to prepare a plan and calculations, and the city will approve within 2-3 weeks per the Engineering Depa APPROVED 28 LOT FINAL MAP. 95% SHOVEL READY. FULLY ENTITLED. SUBDIVISION, LIEN, & COA AGREEMENT WITH CITY. APPROVED ENGINEERED PLANS. GO TO: https://calprop.com/real-estate for all maps, subdivision agreement, COA, and other other downloadable documents. Owner recommends not building on Lot 5 given feasibility of retaining wall cost (significant savings). Project Notes, Tract 29476 in the City of Wildomar Project Name: Alta Colina, LLC Permits/Reports: California Water Boards, Stormwater WDID/App ID: 9-33C371295 45043, ACTIVE NPDES, WQMP, Army Corp, 401, 404, and MSHCP permits are ACTIVE. A burrowing owl study which is only valid for 30 days has to be re-submitted to City before grading. This process is inexpensive and the City will process immediately. 11 acres to be owned/managed by the RCA (Lots 29 and 30 are the RCA lots in the plans). A soils report has already been submitted and approved. Significant DG material, a huge plus. All entitlements and biologicals are completed (except burrowing owl). Plans: Owner/Builder strongly recommend that the buyer retains Osment Grading. Recent grading bid available as of March 2021. Grading can begin immediately after a final retaining wall plan is submitted and the grading bond is posted (grading permit is paid), but another builder may want to submit their own wall design. The Verdura retaining wall system in builder estimate will be the most cost effective solution (reviewed 3 systems). This will require a structural engineer to prepare a plan and calculations, and the city will approve within 2-3 weeks per the Engineering Department, or Kameron Saber, who is the Senior City Engineer. Water and sewer plans were approved, but they did recently expire. A new will serve letter was just completed by EVMWD. Engineers advised us that the plans can be quickly plan checked again for approximately $4,000.00 with the Elsinore Valley Water District (engineer cost). This is can be done within 2 weeks per our c...
Elementary School |
Middle School |
High School |
Click Here Distance: N/A Miles |
Click Here Distance: N/A Miles |
Click Here Distance: N/A Miles |
Price History
4/2/2021 | Listed $1,750,000 |
4/12/2021 | 6% - $1,650,000 |
HOA Fee | 0.0 |
Price Per Sq Ft | 83207.26 |
Sale/rent | For Sale |
Site | Cul-De-Sac |
Terms | Cash, Conventional, Land Contract |
Topography | Rolling |
Exterior Features
Lot Dimensions | 28 Lots with fi |